Saudi Arabia ships Double RO Seawater Desalination System Project Cases

 Customer case    |      2024-08-30

Project location: Saudi Arabia ship


Date: Starting from August 2024


Project background:

During the maintenance period of the ship's shore, it is necessary to install double reverse osmosis seawater desalination equipment to meet the service needs of domestic water and equipment water on board.

Customized split design of equipment based on the size of the cabin inlet and outlet in the early stage.

After entering the cabin, assemble and debug the equipment.


Project scale: 30 tons/day (1250L/hr)


成品人视频免费看100部





成品人视频免费看100部

More equipment details:30TPD Double RO Seawater Desalination System



成品人视频免费看100部


Please contact us for more details.


成品人视频免费看100部Mobile: +86 13326682480(Steve)

                        +86 13326657486(Abey)

成品人视频免费看100部Whatsapp: +86 13798988771(Steve)

                               +86 15919223536(Abey)

成品人视频免费看100部Email: steve@zhwywater.com

                     [email protected]